Posted on November 6, 2009 by Rob Ford

Ravine Road Paving



Ravine Road Paving

Saturday, November 7th, 2009

From approximately 8am to 11am

Border Paving will be repairing

the ravine road.

 

Road crews & equipment will be present and the

road will be oiled for part of this time period.

 

The road will be accessible during the majority of this time, however, will be closed intermittently for packing.

 

Please use caution.


Posted in Residence Life. | Permalink

Comments are closed.